What we do

from first sketch to handover.

We take on a handful of projects a year so that every one gets the same three people from start to finish.

Services

Four ways we work

01

Design

Permit drawings, construction documentation and full coordination with engineers.

From €4 800

02

Interiors

Spaces, materials, furniture — from concept to the last site adjustment.

From €3 200

03

Delivery

Contractor selection, site supervision, cost tracking with weekly reports.

5% of build

04

Survey

Condition surveys of existing buildings and feasibility studies for conversions.

From €900

Process

One project, four phases

  1. 01

    Brief

    Two sessions on site: what the building must do, what it must cost.

  2. 02

    Concept

    Plans, a physical model and one material board. Two revisions included.

  3. 03

    Permit

    Documentation for authorities, with structural and mechanical engineers.

  4. 04

    Build

    Tender, contractor selection and weekly site visits until handover.

Questions

Before you write

What does a house cost to design?+

Design fees usually land between 8 and 12 percent of the construction budget, depending on complexity and the level of site supervision you want.

How long does a permit take?+

In Hungary, six to nine months from submission is realistic for a family house. We plan the timeline with you before the first drawing.

Do you work outside Budapest?+

Yes, across Hungary, and we have delivered two projects in Austria.

Can you work with our contractor?+

Often, yes — we review their quote and take over site supervision if the contract allows it.